Item request has been placed! ×
Item request cannot be made. ×
loading  Processing Request

Integrated Scheduling for Steelmaking Continuous Casting— Hot Rolling Processes considering Hot Chain Logistics.

Item request has been placed! ×
Item request cannot be made. ×
loading   Processing Request
  • Additional Information
    • NAICS/Industry Codes:
      331315 Aluminum Sheet, Plate, and Foil Manufacturing
      334513 Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables
      333994 Industrial Process Furnace and Oven Manufacturing
      331110 Iron and Steel Mills and Ferroalloy Manufacturing
    • Abstract:
      Steelmaking continuous casting (SCC)—hot rolling (HR) is a key process in the production of steel products. It is also a process with large energy consumption. Energy saving has always been an important goal of production scheduling of this process. In this paper, aiming at integrated scheduling optimization for SCC-HR processes, energy saving objective is converted to minimize waiting time of slabs in slab yard, so as to reduce slab temperature loss and achieve the goal of saving energy. An integrated two-stage mathematical programming model is established for the above problems, and a hybrid algorithm of genetic algorithm and linear programming is designed for the integrated model. The correctness of the model and the validity of the algorithm are verified by computational experiments using simulated instances. [ABSTRACT FROM AUTHOR]
    • Abstract:
      Copyright of Mathematical Problems in Engineering is the property of Hindawi Limited and its content may not be copied or emailed to multiple sites or posted to a listserv without the copyright holder's express written permission. However, users may print, download, or email articles for individual use. This abstract may be abridged. No warranty is given about the accuracy of the copy. Users should refer to the original published version of the material for the full abstract. (Copyright applies to all Abstracts.)
    • Author Affiliations:
      1College of Electronic and Information Engineering, Tongji University, Shanghai 201804, China
      2Shanghai Baosight Software Limited Company, Shanghai 201900, China
      3College of Information Science & Engineering, Northeastern University, Shenyang 110819, China
    • Full Text Word Count:
      6821
    • ISSN:
      1024-123X
    • Accession Number:
      10.1155/2020/6902934
    • Accession Number:
      143042258
  • Citations
    • ABNT:
      WANG, S.; SHI, Y.; LIU, S. Integrated Scheduling for Steelmaking Continuous Casting— Hot Rolling Processes considering Hot Chain Logistics. Mathematical Problems in Engineering, [s. l.], p. 1–10, 2020. DOI 10.1155/2020/6902934. Disponível em: http://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=asn&AN=143042258&custid=s8280428. Acesso em: 6 ago. 2020.
    • AMA:
      Wang S, Shi Y, Liu S. Integrated Scheduling for Steelmaking Continuous Casting— Hot Rolling Processes considering Hot Chain Logistics. Mathematical Problems in Engineering. May 2020:1-10. doi:10.1155/2020/6902934.
    • AMA11:
      Wang S, Shi Y, Liu S. Integrated Scheduling for Steelmaking Continuous Casting— Hot Rolling Processes considering Hot Chain Logistics. Mathematical Problems in Engineering. May 2020:1-10. doi:10.1155/2020/6902934
    • APA:
      Wang, S., Shi, Y., & Liu, S. (2020). Integrated Scheduling for Steelmaking Continuous Casting— Hot Rolling Processes considering Hot Chain Logistics. Mathematical Problems in Engineering, 1–10. https://doi.org/10.1155/2020/6902934
    • Chicago/Turabian: Author-Date:
      Wang, Sen, Yarong Shi, and Shixin Liu. 2020. “Integrated Scheduling for Steelmaking Continuous Casting— Hot Rolling Processes Considering Hot Chain Logistics.” Mathematical Problems in Engineering, May, 1–10. doi:10.1155/2020/6902934.
    • Harvard:
      Wang, S., Shi, Y. and Liu, S. (2020) ‘Integrated Scheduling for Steelmaking Continuous Casting— Hot Rolling Processes considering Hot Chain Logistics’, Mathematical Problems in Engineering, pp. 1–10. doi: 10.1155/2020/6902934.
    • Harvard: Australian:
      Wang, S, Shi, Y & Liu, S 2020, ‘Integrated Scheduling for Steelmaking Continuous Casting— Hot Rolling Processes considering Hot Chain Logistics’, Mathematical Problems in Engineering, pp. 1–10, viewed 6 August 2020, .
    • MLA:
      Wang, Sen, et al. “Integrated Scheduling for Steelmaking Continuous Casting— Hot Rolling Processes Considering Hot Chain Logistics.” Mathematical Problems in Engineering, May 2020, pp. 1–10. EBSCOhost, doi:10.1155/2020/6902934.
    • Chicago/Turabian: Humanities:
      Wang, Sen, Yarong Shi, and Shixin Liu. “Integrated Scheduling for Steelmaking Continuous Casting— Hot Rolling Processes Considering Hot Chain Logistics.” Mathematical Problems in Engineering, May 4, 2020, 1–10. doi:10.1155/2020/6902934.
    • Vancouver/ICMJE:
      Wang S, Shi Y, Liu S. Integrated Scheduling for Steelmaking Continuous Casting— Hot Rolling Processes considering Hot Chain Logistics. Mathematical Problems in Engineering [Internet]. 2020 May 4 [cited 2020 Aug 6];1–10. Available from: http://search.ebscohost.com/login.aspx?direct=true&site=eds-live&db=asn&AN=143042258&custid=s8280428