Item request has been placed! ×
Item request cannot be made. ×
  Processing Request
Academic Journal

Heuristics to minimize the completion time variance of jobs on a single machine and on identical parallel machines.

Subjects: *HEURISTIC algorithms; *PRODUCTION scheduling; *MACHINE theory

  • Source: International Journal of Advanced Manufacturing Technology. Feb2017, Vol. 88 Issue 5-8, p1923-1936. 14p. 2 Diagrams, 6 Charts.

Record details

×
Academic Journal

Review and classification of constructive heuristics mechanisms for no-wait flow shop problem.

Subjects: *MANUFACTURING processes; *HEURISTIC; *COMPOSITE materials

  • Source: International Journal of Advanced Manufacturing Technology. Sep2016, Vol. 86 Issue 5-8, p2161-2174. 14p. 1 Diagram, 8 Charts.

Record details

×
Academic Journal

Effective heuristics for the no-wait flow shop scheduling problem with total flow time minimization.

Subjects: *HEURISTIC algorithms; *PRODUCTION scheduling; *STANDARD deviations

  • Source: International Journal of Advanced Manufacturing Technology. Jun2013, Vol. 66 Issue 9-12, p1563-1572. 10p. 8 Charts, 2 Graphs.

Record details

×
Academic Journal

Two meta-heuristics for a multi-period minisum location-relocation problem with line restriction.

Subjects: *HEURISTIC algorithms; *LOCATION problems (Programming); *NONLINEAR programming

  • Source: International Journal of Advanced Manufacturing Technology. Mar2014, Vol. 71 Issue 5-8, p1033-1048. 16p. 7 Charts, 5 Graphs.

Record details

×
Academic Journal

Hybrid-directional planning: improving improvement heuristics for scheduling resource-constrained projects.

Subjects: *HEURISTIC; *PLANNING; *COMBINATORIAL optimization

  • Source: International Journal of Advanced Manufacturing Technology. Jun2009, Vol. 41 Issue 3/4, p358-366. 9p. 3 Charts.

Record details

×
Academic Journal

Bi-objective heuristics for multi-item freights distribution planning problem in crossdocking networks.

Subjects: *HEURISTIC algorithms; *SIMULATED annealing; *TARDINESS

  • Source: International Journal of Advanced Manufacturing Technology. Feb2012, Vol. 58 Issue 9-12, p1201-1216. 16p. 2 Diagrams, 7 Charts, 1 Graph.

Record details

×
Academic Journal

Last two fit augmentation to the well-known construction heuristics for one-dimensional bin-packing problem: an empirical study.

Subjects: *HEURISTIC algorithms; *CONSTRUCTION industry; *COMBINATORIAL optimization

  • Source: International Journal of Advanced Manufacturing Technology. Oct2010, Vol. 50 Issue 9-12, p1145-1152. 8p. 4 Diagrams, 3 Charts.

Record details

×
Academic Journal

Two meta-heuristics for three-stage assembly flowshop scheduling with sequence-dependent setup times.

Subjects: *HEURISTIC algorithms; *OPERATIONS research; *ASSEMBLY line methods

  • Source: International Journal of Advanced Manufacturing Technology. Oct2010, Vol. 50 Issue 9-12, p1153-1164. 12p. 2 Diagrams, 4 Charts, 7 Graphs.

Record details

×
Academic Journal

Optimal adaptive Kanban-type production control.

Subjects: *PRODUCTION control; *HEURISTIC algorithms; *MANUFACTURING processes

  • Source: International Journal of Advanced Manufacturing Technology. Jul2018, Vol. 97 Issue 5-8, p2887-2905. 19p. 2 Diagrams, 6 Charts, 7 Graphs.

Record details

×
  • 1-10 of  1,015 results for ""Heuristics""